Installation & Setting up

Installation & Setting up




Crane installation

Crane installation begins with the start of the contract and purchase. Ensure the start date of the project and the budget and schedule. After you choose the type of crane for your application and Tesla Crane Company as your supplier and the contract for the purchase of the crane is signed, the installation of the crane will be on the agenda. Tesla Crane Company, after serving thousands of customers by installing cranes, now summarizes the method of installing cranes from the beginning to the end. Providing a final plan for installing your crane can give you a clear picture of all the steps

Methods and schedule of installation of overhead cranes:

What after signing the contract for the purchase of cranes and the arrival of the installation team of Tesla Company to your company and the installation site of the crane and the presentation of the final plans of the shed by your company and reviewing the restrictions of the shed in terms of height, width and placement of machines. The most designed for the construction and installation of cranes

Preparation before installing the overhead crane

Installation of overhead cranes should be considered at the beginning of the purchase of overhead cranes. A schedule or time frame is provided by the installation team to show you how they complete the installation of overhead cranes. Normal cranes are usually installed between 1 to 10 working days and for complex cranes to be installed for a longer period of time, the crane needs to be installed consecutively and in parallel when the preparation work is done with longitudinal and power rails and .... To break the time, it is done that until the cranes under construction are ready, they will be placed and set up in the designated place without the slightest problem. Note that the installation process of the crane is fluid and due to overhead crane production programs or delays Construction by the purchasing company may lead to a change in the completion date. To determine if the crane project is on schedule, a weekly status is presented to the buyer for one week.

Scope of work

Identify the location of the crane installation Danger and possible obstacles

What is the condition of existing beams? Is there a need for new or modified beams in existing beams?